Getting closer . Power and plumbing is all roughed in inside the building now . Just waiting for the final hook up from the Power Corporation .Still running on temporary power source .  New water main ran to the building last week . The Rotary lift will be here soon for installation . Taking a little longer than expected and soon will be into a new season .  Dry wall tappers are getting the final touches done and are starting to get walls ready for mud . You can get a feel for the place now . Al's new shop is huge . 
Pony panel in cold storage section of shop . Door way to lunch room .
 New superintendents and assistant supers offices . Lots of natural lighting . 
 Wash rooms are roughed in both have showers in them . 
 Large area for the locker room .
 A few pics of the offices .
 The workers coming in from cold storage area into lunchroom . 
 Al's shop . No lights on . great to have all that natural light coming in . Just to the left of the saw horse will be the lift . Electrical room in the background . The ventilation has carbon monoxide detectors and will vent building as needed (wow). 
 The grinding room is almost half the size of my current shop at the old course . Very nice having the ventilation . 
More tech's shop pics.